Shenzhen Speed-Up Handles Hydro Turbine Shipment from China to Europe
We are pleased to highlight a major project cargo operation carried out by our member, Shenzhen Speed-Up Int'l Logistics Co., Ltd., China, involving the transportation of an oversized hydro turbine shipment from Shanghai, China, to Rotterdam, the Netherlands.
Conducted between April and June 2026, the three-month project involved multiple breakbulk shipments, flat rack containers, and standard containers, requiring comprehensive logistics coordination and specialized cargo handling.
Comprehensive Logistics for Hydro Turbine Components
The project involved the transportation of heavy and oversized hydro turbine components, with Shenzhen Speed-Up managing various stages of the logistics process.
The company's scope of services included:
- Warehousing: Storage of cargo before shipment.
- Loading and Lashing: Loading and securing oversized components for transportation.
- Third-Party Survey: Arranging independent cargo inspections.
- Customs Clearance: Managing export customs procedures.
- Ocean Freight: Coordinating maritime transportation from Shanghai to Rotterdam.
Through these services, Shenzhen Speed-Up provided an integrated logistics solution for the international transportation of industrial equipment.
Shipment Overview
The project involved a combination of breakbulk cargo and containerized shipments, with the following details:
- Commodity: Hydro Turbine Parts
- Port of Loading: Shanghai, China
- Port of Discharge: Rotterdam, the Netherlands
- Project Period: April – June 2026
- Duration: 3 Months
Total Shipment:
- 3 Units of Breakbulk (BBK) Cargo
- 11 × 40' Flat Rack (FR)
- 3 × 20' Flat Rack (FR)
- 1 × 40' High Cube (HQ)
- 1 × 20' General Purpose (GP)
Handling Heavy and Oversized Cargo
The shipment included hydro turbine components with substantial dimensions and weights, requiring specialized loading, lashing, and transportation arrangements.
The cargo specifications included:
- Breakbulk Cargo (BBK): 3 units, each measuring 680 × 640 × 305 cm and weighing 19,000 kg.
- 20' Flat Rack (OWH): Dimensions of 440 × 390 × 396 cm, weighing 15,000 kg.
- 40' Flat Rack (OWH): Cargo dimensions of 780 × 280 × 355 cm + 270 × 270 × 35 cm, weighing 15,000 kg.
- 40' Flat Rack (OW): Cargo dimensions of 320 × 275 × 90 cm + 270 × 270 × 35 cm + 320 × 275 × 90 cm, weighing 22,000 kg.
The combination of different cargo dimensions, weights, and equipment types required careful coordination throughout the project.
Shenzhen Speed-Up arranged the necessary loading and lashing operations, third-party surveys, and customs clearance procedures to support the safe handling and transportation of the hydro turbine components.
Supporting International Energy Equipment Transportation
The successful coordination of this three-month project highlights Shenzhen Speed-Up's capabilities in handling complex industrial cargo and managing international shipments involving multiple transportation requirements.
From warehousing and cargo preparation to export clearance and ocean freight arrangements, the company provided comprehensive logistics services for the movement of hydro turbine parts between China and Europe.
The operation demonstrates Shenzhen Speed-Up's experience in managing breakbulk and out-of-gauge cargo, particularly for industrial equipment requiring specialized handling and transportation solutions.
We congratulate our member, Shenzhen Speed-Up Int'l Logistics Co., Ltd., on this significant project cargo operation and look forward to sharing more achievements from their team.

